.news_title { } .deepblue_role { } .presentation { } .document { } .extlink { } .intlink {}
The purpose of this activity carried out for Eurocontrol was to outline and maintain a Validation Strategy and Plan for all the future activities necessary to consolidate the ASPA S&M concept.
This work identified a set of Validation Objectives on the basis of a performed stakeholder analysis, which set the Validation Expectations. Then, this activity defined how the concept could be validated against them, through a co-ordinated and integrated set of validation exercises (e.g. Model Based Simulations, Real Time Simulations, Cockpit simulations). The approach was based on the European Operational Concept Validation methodology (E-OCVM) and considered the implicit and explicit validation objectives already identified and the issues already addressed during the previous experiments and the past and on-going work on similar ATM concepts.
Clients: EUROCONTROL
Period:
2005 - 2006
Keywords: Validation, Strategy, E-OCVM
Deep Blue contact: